日本一区二区在线-国产情侣在线视频-羞羞的视频在线观看-亚洲婷婷在线-精品福利一区-成人精品二区-男女做的视频-国产精品久久999-国产www网站-99ri国产在线-av 高清 尿 小便 嘘嘘-欧美最新精品-国产黄色在线免费-超大gaygays免费观看-韩国毛片一区

NEWS CENTER
媒體新聞
Good start in 2021 | Welle Group wins six projects to treat leachate from the receiving bunker of incineration plants.
發布日期:2021-03-01 瀏覽次數:3

In the case of very wet waste, a not inconsiderable part of the water contained in the waste is squeezed out in the receiving bunkers of incineration plants due to the stack weight. This highly contaminated wastewater is collected at the bunker bottom and treated using technically challenging processes such as anaerobic technology, membrane bioreactors as well as nanofiltration and reverse osmosis. The removal of water from the waste increases the calorific value and thus the efficiency of the downstream combustion process. WELLE Group, as one of the market leaders in this application, has already been able to underwrite 6 projects in 2021.  

 

In the city of Handan (Hebei Province), a plant for 450 m3/d is being built on behalf of Northwest Power Construction First Engineering Co., Ltd. In addition to the turnkey delivery, a 2-year operation management has been contracted. Besides, the other two orders both with the scale of 250m3/d were placed by Northwest Power Construction Third Engineering Co., Ltd in Handan city, which respectively in Handan Eastern Recycling Industrial Park and Cixian ( a county under Handan City).

 

Two orders were placed by Shanghai SUS Environment Co, Ltd. One wastewater treatment order was placed for an incineration plant in Shunping. Shunping is a county in the west-central part of Hebei province, China. The scope of supply consists of technical services as well as equipment supply and after-sales service. Another order was placed for Qianzishan (Wuhan city). The capacity of this plant is 450 m3/d. In Qianzishan, a two-year operation management is part of the contract.   

 

A sixth plant for the treatment of wastewater from the receiving bunkers of incineration plants was obtained in Dingxi (Gansu province. ) The plant there will treat 250 m3/d. The customer is Zhejiang Wangneng Environment Co., Ltd.

 

Pu Yanxin, Vice President of the WELLE Group and General Manager of the Water Business Unit says: "These projects won in 2021 show the strength of the WELLE Group in this application. To treat wastewater from receiving bunkers, the world's first plant for this wastewater application was built by WELLE in 2005. WELLE Group is the international market leaders in Bunker waste water treatment. Our success is a sign of our innovative strength. We are pleased that we will be able to further expand our strong position in 2021. And we are pleased about the continued strong trust of our customers. Thank you very much for that!"